42-009-34984

Final Completion

BELL GRACE

ARCHER County · District 9 · TWIN OAKS CONSTRUCTION COMPANY · ARCHER COUNTY REGULAR

RRC Lookup

Permits

1

Max Depth

1,000 ft

First Permit

1981-02-05

Latest Activity

1981-02-05

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-11-22

Shut-In

Plugged

2013-11-05

!

EWA / Permit operator mismatch

Scheduling: TWIN OAKS CONSTRUCTION COMPANY ≠ Permit: LEWIS, W.H.

Resolved via: schedulingTWIN OAKS CONSTRUCTION COMPANY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#107660 A LEWIS, W.H.
received 1981-02-05

Well Details

Well Number
5-S
Max Depth
1,000 ft
Drill Type
Vertical
County
ARCHER
District
9
Completed
1981-11-22

Operator

Location
IRVING
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
55,888 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/G, OPRS/O
Total Permits
2

External Links

Live © 2026 Petrora