42-009-35143
Final CompletionCHABA A
ARCHER County · District 9 · WILTON PETROLEUM CO. · ARCHER COUNTY REGULAR
Permits
1
Max Depth
1,317 ft
First Permit
1981-04-10
Latest Activity
1981-04-10
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1982-01-22
Shut-In
—
Plugged
2021-08-27
!
EWA / Production operator mismatch
Scheduling: WILTON PETROLEUM CO. ≠ Production: WADE, JIM (reported 2025-12)
!
EWA / Permit operator mismatch
Scheduling: WILTON PETROLEUM CO. ≠ Permit: BAIR-LEE OIL CO., INC.
Resolved via: production → WADE, JIM
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#114745 A BAIR-LEE OIL CO., INC.
received 1981-04-10
Well Details
- Well Number
- 1D
- Max Depth
- 1,317 ft
- Drill Type
- Vertical
- County
- ARCHER
- District
- 9
- Operator
- WILTON PETROLEUM CO.
- Completed
- 1982-01-22
Operator
- Name
- WILTON PETRO CO
- Location
- MEGARGEL
- P-5 Status
- Y (filed 1997-01-04)
- Cum Oil (all leases)
- 2,623 bbl
- Cum Gas (all leases)
- — mcf
- Total Permits
- 3