42-013-30343
Final CompletionHEINEN D.D.
ATASCOSA County · District 1 · LPG ENERGY COMPANY · HOLLOWAY EAST (BUDA)
Permits
2
Max Depth
7,000 ft
First Permit
1986-01-22
Latest Activity
1986-01-22
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1977-02-16
Shut-In
—
Plugged
2007-07-17
!
EWA / Permit operator mismatch
Scheduling: LPG ENERGY COMPANY ≠ Permit: AMAL OIL CO, INC.
Resolved via: scheduling → LPG ENERGY COMPANY
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
originally filed by AMAL OIL CO, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#296004 A AMAL OIL CO, INC.
received 1988-10-06
#296004 A AMAL OIL CO, INC.
received 1985-11-27
Well Details
- Well Number
- 13
- Max Depth
- 7,000 ft
- Drill Type
- Vertical
- County
- ATASCOSA
- District
- 1
- Operator
- LPG ENERGY COMPANY
- Completed
- 1977-02-16
Operator
- Name
- LPG ENGY CO
- Location
- BELLAIRE
- P-5 Status
- Y (filed 2007-11-03)
- Cum Oil (all leases)
- 2,808 bbl
- Cum Gas (all leases)
- — mcf
- Total Permits
- 10