42-013-31184

Final Completion

BRIGGS

ATASCOSA County · District 1 · CALAME RICHARD · SOMERSET

RRC Lookup

Permits

1

Max Depth

1,600 ft

First Permit

1981-01-14

Latest Activity

1981-01-14

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-08-27

Shut-In

Plugged

2005-05-26

!

EWA / Permit operator mismatch

Scheduling: CALAME RICHARD ≠ Permit: FLORI-TEX ENERGY CORP.

Resolved via: schedulingCALAME RICHARD

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

Chain of Custody

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#105354 A FLORI-TEX ENERGY CORP.
received 1981-01-14

Well Details

Well Number
6-A
Max Depth
1,600 ft
Drill Type
Vertical
County
ATASCOSA
District
1
Completed
1981-08-27

Operator

Location
DEVINE
P-5 Status
Y (filed 2005-02-04)
Cum Oil (all leases)
7,131 bbl
Cum Gas (all leases)
— mcf

External Links

Live © 2026 Petrora