42-013-31451
Final CompletionSTAPP W.E.
ATASCOSA County · District 1 · RALYN CORP. · JOURDANTON (RECKLAW)
Permits
1
Max Depth
1,600 ft
First Permit
1982-04-02
Latest Activity
1982-04-02
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1982-04-10
Shut-In
—
Plugged
2013-05-23
!
EWA / Permit operator mismatch
Scheduling: RALYN CORP. ≠ Permit: THORNE, JAMES R.
Resolved via: scheduling → RALYN CORP.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
originally filed by THORNE, JAMES R. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#155964 A THORNE, JAMES R.
received 1982-04-02
Well Details
- Well Number
- 3
- Max Depth
- 1,600 ft
- Drill Type
- Vertical
- County
- ATASCOSA
- District
- 1
- Operator
- RALYN CORP.
- Completed
- 1982-04-10
Operator
- Name
- RALYN CORP
- Location
- PLEASANTON
- P-5 Status
- Y (filed 2022-12-02)
- Cum Oil (all leases)
- 16,024 bbl
- Cum Gas (all leases)
- — mcf
- Total Permits
- 1