42-013-31783

Final Completion

MILLER BROS.

ATASCOSA County · District 1 · MAZCO ENERGY LLC · JOURDANTON (RECKLAW)

RRC Lookup

Permits

1

Max Depth

1,750 ft

First Permit

1983-01-28

Latest Activity

1983-01-28

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-02-10

Shut-In

Plugged

2023-11-03

!

EWA / Permit operator mismatch

Scheduling: MAZCO ENERGY LLC ≠ Permit: CUDE, JAMES W. OIL

Resolved via: productionMAZCO ENERGY LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#184503 A CUDE, JAMES W. OIL
received 1983-01-28

Well Details

Well Number
2
Max Depth
1,750 ft
Drill Type
Vertical
County
ATASCOSA
District
1
Completed
1983-02-10

Operator

Location
SAN ANTONIO
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
136,503 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
1

External Links

Live © 2026 Petrora