42-013-32617

Final Completion

MILLER BROS.

ATASCOSA County · District 1 · MAZCO ENERGY LLC · JOURDANTON (RECKLAW)

RRC Lookup

Permits

1

Max Depth

1,800 ft

First Permit

1984-03-15

Latest Activity

1984-03-15

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-08-30

Shut-In

Plugged

2012-05-21

!

EWA / Permit operator mismatch

Scheduling: MAZCO ENERGY LLC ≠ Permit: CUDE, JAMES W. OIL

Resolved via: productionMAZCO ENERGY LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#232499 A CUDE, JAMES W. OIL
received 1984-03-14

Well Details

Well Number
8
Max Depth
1,800 ft
Drill Type
Vertical
County
ATASCOSA
District
1
Completed
1984-08-30

Operator

Location
SAN ANTONIO
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
136,503 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
1

External Links

Live © 2026 Petrora