42-013-34078

Final Completion [SWD] Water

MALLARD

ATASCOSA County · District 1 · PEDECO INC. · PEARSALL (AUSTIN CHALK)

RRC Lookup

Permits

2

Max Depth

6,500 ft

First Permit

1997-02-25

Latest Activity

2010-09-07

Lifespan

14 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1997-05-13

Shut-In

Plugged

1999-02-05

!

EWA / Permit operator mismatch

Scheduling: PEDECO INC. ≠ Permit: HOLLIMON OIL CORPORATION

Resolved via: schedulingPEDECO INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1997-08

Last Production

2026-03

Operator History

originally filed by HOLLIMON OIL CORPORATION — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#701539 A HOLLIMON OIL CORPORATION
received 2010-08-31
#459098 A PEDECO, INC.
received 1997-02-25

Well Details

Well Number
3
Max Depth
6,500 ft
Drill Type
Vertical
County
ATASCOSA
District
1
Operator
PEDECO INC.
Completed
1997-05-13

Operator

Location
CASPER
P-5 Status
Y (filed 2005-06-10)
Cum Oil (all leases)
641,487 bbl
Cum Gas (all leases)
2,169,623 mcf
Total Permits
170

External Links

Live © 2026 Petrora