42-013-34852

PRODUCING Horizontal

CHILIPITIN LTD.

ATASCOSA County · District 1 · RICKAWAY ENERGY CORP. · BRISCOE RANCH (EAGLEFORD)

RRC Lookup

Permits

2

Max Depth

12,700 ft

First Permit

2013-11-05

Latest Activity

2013-11-05

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2014-09-25

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: RICKAWAY ENERGY CORP. ≠ Permit: CABOT OIL & GAS CORPORATION

Resolved via: productionRICKAWAY ENERGY, CORP.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2012-09

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#772717 A CABOT OIL & GAS CORPORATION
received 2014-07-31
#772717 A CABOT OIL & GAS CORPORATION
received 2013-10-29

Well Details

Well Number
12H
Max Depth
12,700 ft
Drill Type
Horizontal
County
ATASCOSA
District
1
Completed
2014-09-25

Operator

Location
PLEASANTON
P-5 Status
Y (filed 2025-06-04)
Cum Oil (all leases)
820,356 bbl
Cum Gas (all leases)
73,321 mcf
Activities
OPRS/G, OPRS/O
Total Permits
6

External Links

Live © 2026 Petrora