42-015-30469

Final Completion

BASTIAN OTTO G. U. #1

AUSTIN County · District 3 · CHEVRON U. S. A. INC. · NEW ULM (EDWARDS)

RRC Lookup

Permits

1

Max Depth

16,600 ft

First Permit

1980-10-24

Latest Activity

1980-10-24

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1994-03-15

Shut-In

Plugged

2005-09-11

!

EWA / Permit operator mismatch

Scheduling: CHEVRON U. S. A. INC. ≠ Permit: SUPERIOR OIL COMPANY, THE

Resolved via: schedulingCHEVRON U. S. A. INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2005-09

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#96763 A SUPERIOR OIL COMPANY, THE
received 1980-10-24

Well Details

Well Number
1
Max Depth
16,600 ft
Drill Type
Vertical
County
AUSTIN
District
3
Completed
1994-03-15

Operator

Location
MIDLAND
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
622,347,311 bbl
Cum Gas (all leases)
4,191,207,826 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/C, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
9,225

External Links

Live © 2026 Petrora