42-015-30736
Final CompletionORVILLE
AUSTIN County · District 3 · LONE OAK ENERGY INC · EL PLEASANT (WILCOX UP)
Permits
2
Max Depth
10,900 ft
First Permit
1999-07-01
Latest Activity
1999-07-01
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2000-12-31
Shut-In
—
Plugged
2005-07-08
!
EWA / Permit operator mismatch
Scheduling: LONE OAK ENERGY INC ≠ Permit: CG OPERATING, INC.
Resolved via: scheduling → LONE OAK ENERGY INC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2000-12
Last Production
2005-07
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#485594 A LONE OAK ENERGY INC
received 2001-03-16
#485594 A CG OPERATING, INC.
received 1999-07-01
Well Details
- Well Number
- 1
- Max Depth
- 10,900 ft
- Drill Type
- Vertical
- County
- AUSTIN
- District
- 3
- Operator
- LONE OAK ENERGY INC
- Completed
- 2000-12-31
Operator
- Name
- LONE OAK ENGY INC
- Location
- KYLE
- P-5 Status
- Y (filed 2026-02-04)
- Cum Oil (all leases)
- 19,810 bbl
- Cum Gas (all leases)
- 4,253,108 mcf
- Activities
- OPRS/G
- Total Permits
- 25