42-021-31011
Final CompletionPATRIDGE TAYLOR UNIT
BASTROP County · District 3 · BAILEYS ENERGY LLC · SERBIN (TAYLOR SAND)
Permits
1
Max Depth
6,000 ft
First Permit
1987-03-02
Latest Activity
1987-03-02
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1987-10-22
Shut-In
—
Plugged
2022-01-25
!
EWA / Permit operator mismatch
Scheduling: BAILEYS ENERGY LLC ≠ Permit: MINERALS OF TEXAS, INC.
Resolved via: scheduling → BAILEYS ENERGY LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#327196 A MINERALS OF TEXAS, INC.
received 1987-03-02
Well Details
- Well Number
- 1
- Max Depth
- 6,000 ft
- Drill Type
- Vertical
- County
- BASTROP
- District
- 3
- Operator
- BAILEYS ENERGY LLC
- Completed
- 1987-10-22
Operator
- Name
- BAILEYS ENERGY, LLC
- Location
- SAN JUAN CA, PO
- P-5 Status
- Y (filed 2023-02-03)
- Cum Oil (all leases)
- 1,899 bbl
- Cum Gas (all leases)
- — mcf