42-023-30777

Final Completion

HARGRAVE-PORTWOOD F

BAYLOR County · District 7 · SMITH PIPE OF ABILENE · HONEY BEE (MISSISSIPPIAN)

RRC Lookup

Permits

1

Max Depth

5,300 ft

First Permit

1981-07-13

Latest Activity

1981-07-13

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1989-07-08

Shut-In

Plugged

1997-06-27

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: CHITAL PETROLEUM CORP.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2003-08

Operator History

originally filed by CHITAL PETROLEUM CORP. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#125086 A CHITAL PETROLEUM CORP.
received 1981-07-13

Well Details

Well Number
2
Max Depth
5,300 ft
Drill Type
Vertical
County
BAYLOR
District
7
Completed
1989-07-08

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora