42-023-30777
Final CompletionHARGRAVE-PORTWOOD F
BAYLOR County · District 7 · SMITH PIPE OF ABILENE · HONEY BEE (MISSISSIPPIAN)
Permits
1
Max Depth
5,300 ft
First Permit
1981-07-13
Latest Activity
1981-07-13
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1989-07-08
Shut-In
—
Plugged
1997-06-27
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: CHITAL PETROLEUM CORP.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2003-08
Operator History
originally filed by CHITAL PETROLEUM CORP. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#125086 A CHITAL PETROLEUM CORP.
received 1981-07-13
Well Details
- Well Number
- 2
- Max Depth
- 5,300 ft
- Drill Type
- Vertical
- County
- BAYLOR
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1989-07-08
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf