42-023-31829

Final Completion

WAGGONER DS SOUTH G

BAYLOR County · District 9 · WAGGONER OPERATING L.L.C. · BAYLOR COUNTY REGULAR

RRC Lookup

Permits

1

Max Depth

9,000 ft

First Permit

2025-04-14

Latest Activity

2025-04-14

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2025-05-15

Shut-In

Plugged

2025-12-29

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2025-05

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#907382 A WAGGONER OPERATING, L.L.C.
received 2025-04-11
Lat 33.695065
Lon -99.077555

Well Details

Well Number
790DS
Max Depth
9,000 ft
Drill Type
Vertical
County
BAYLOR
District
9
Completed
2025-05-15

Operator

Location
VERNON
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
359,111 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
53

External Links

Live © 2026 Petrora