42-029-31203

Final Completion

MALDONADO JOSE S.

BEXAR County · District 1 · MORE TEXAS OIL · FAIRFIELD

RRC Lookup

Permits

1

Max Depth

1,350 ft

First Permit

1980-10-28

Latest Activity

1980-10-28

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-02-03

Shut-In

Plugged

1999-05-22

!

EWA / Permit operator mismatch

Scheduling: MORE TEXAS OIL ≠ Permit: UTOPIA OIL COMPANY

Resolved via: schedulingMORE TEXAS OIL

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#97504 A UTOPIA OIL COMPANY
received 1980-10-28

Well Details

Well Number
1
Max Depth
1,350 ft
Drill Type
Vertical
County
BEXAR
District
1
Completed
1981-02-03

Operator

Location
VON ORMY
P-5 Status
Y (filed 2025-12-04)
Cum Oil (all leases)
49,466 bbl
Cum Gas (all leases)
3,004 mcf

External Links

Live © 2026 Petrora