42-029-31263

Final Completion

PETERSON VOLNEY

BEXAR County · District 1 · HODGE C. ENERGY INC. · FAIRFIELD

RRC Lookup

Permits

1

Max Depth

2,000 ft

First Permit

1980-12-04

Latest Activity

1980-12-04

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-05-11

Shut-In

Plugged

1995-02-24

!

EWA / Permit operator mismatch

Scheduling: HODGE C. ENERGY INC. ≠ Permit: UTOPIA OIL COMPANY

Resolved via: schedulingHODGE C. ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2003-08

Operator History

originally filed by UTOPIA OIL COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#100915 A UTOPIA OIL COMPANY
received 1980-12-04

Well Details

Well Number
1
Max Depth
2,000 ft
Drill Type
Vertical
County
BEXAR
District
1
Completed
1981-05-11

Operator

Location
LAVON
P-5 Status
Y (filed 2016-09-02)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
— mcf
Total Permits
30

External Links

Live © 2026 Petrora