42-029-31908

Final Completion

BAETZ B.A.

BEXAR County · District 1 · TRUE ENERGY INC. · SASPAMCO

RRC Lookup

Permits

1

Max Depth

3,000 ft

First Permit

1981-12-29

Latest Activity

1981-12-29

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1996-01-28

Shut-In

Plugged

1998-10-02

!

EWA / Permit operator mismatch

Scheduling: TRUE ENERGY INC. ≠ Permit: PETRO-CAP, INC.

Resolved via: schedulingTRUE ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1998-12

Operator History

originally filed by PETRO-CAP, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#145671 A PETRO-CAP, INC.
received 1981-12-29

Well Details

Well Number
1
Max Depth
3,000 ft
Drill Type
Vertical
County
BEXAR
District
1
Completed
1996-01-28

Operator

Location
CANYON LAKE
P-5 Status
Y (filed 2016-06-03)
Cum Oil (all leases)
3,445 bbl
Cum Gas (all leases)
— mcf

External Links

Live © 2026 Petrora