42-029-33489

Final Completion

SALINAS DANIEL

BEXAR County · District 1 · ASTRO ENERGY · VON ORMY

RRC Lookup

Permits

1

Max Depth

1,900 ft

First Permit

1983-07-28

Latest Activity

1983-07-28

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-08-30

Shut-In

Plugged

2001-05-31

!

EWA / Permit operator mismatch

Scheduling: ASTRO ENERGY ≠ Permit: G. R. C. PRODUCTION COMPANY

Resolved via: schedulingASTRO ENERGY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

originally filed by G. R. C. PRODUCTION COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#203597 A G. R. C. PRODUCTION COMPANY
received 1983-07-28

Well Details

Well Number
1
Max Depth
1,900 ft
Drill Type
Vertical
County
BEXAR
District
1
Operator
ASTRO ENERGY
Completed
1983-08-30

Operator

Location
VON ORMY
P-5 Status
Y (filed 2016-05-06)
Cum Oil (all leases)
227 bbl
Cum Gas (all leases)
— mcf

External Links

Live © 2026 Petrora