42-029-35167

Final Completion

ENGLE W.D.

BEXAR County · District 1 · RICKAWAY ENERGY CORP. · COOKSEY

RRC Lookup

Permits

1

Max Depth

1,700 ft

First Permit

1984-03-19

Latest Activity

1984-03-19

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-07-02

Shut-In

Plugged

2015-11-10

!

EWA / Permit operator mismatch

Scheduling: RICKAWAY ENERGY CORP. ≠ Permit: MARK IV ENERGY

Resolved via: schedulingRICKAWAY ENERGY CORP.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2016-02

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#232853 A MARK IV ENERGY
received 1984-03-19

Well Details

Well Number
1
Max Depth
1,700 ft
Drill Type
Vertical
County
BEXAR
District
1
Completed
1984-07-02

Operator

Location
PLEASANTON
P-5 Status
Y (filed 2025-06-04)
Cum Oil (all leases)
820,356 bbl
Cum Gas (all leases)
73,321 mcf
Activities
OPRS/G, OPRS/O
Total Permits
6

External Links

Live © 2026 Petrora