42-029-35581
Final CompletionGROBE CLEMENS C.
BEXAR County · District 1 · GENIE OIL COMPANY A · FAIRFIELD
Permits
1
Max Depth
1,300 ft
First Permit
1984-07-10
Latest Activity
1984-07-10
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1984-07-15
Shut-In
—
Plugged
2010-10-01
!
EWA / Permit operator mismatch
Scheduling: GENIE OIL COMPANY A ≠ Permit: D.K.W. ENERGY
Resolved via: scheduling → GENIE OIL COMPANY A
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2010-11
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#244502 A D.K.W. ENERGY
received 1984-07-10
Well Details
- Well Number
- 1
- Max Depth
- 1,300 ft
- Drill Type
- Vertical
- County
- BEXAR
- District
- 1
- Operator
- GENIE OIL COMPANY A
- Completed
- 1984-07-15
Operator
- Location
- DEVINE
- P-5 Status
- Y (filed 2022-01-07)
- Cum Oil (all leases)
- 36,700 bbl
- Cum Gas (all leases)
- — mcf