42-033-31910

Final Completion

ROCK CANYON

BORDEN County · District 8 · SM ENERGY COMPANY · ROCK CANYON (ELLENBURGER)

RRC Lookup

Permits

1

Max Depth

9,650 ft

First Permit

2004-07-09

Latest Activity

2004-07-09

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2004-08-21

Shut-In

Plugged

2014-07-30

!

EWA / Production operator mismatch

Scheduling: SM ENERGY COMPANY ≠ Production: CHAPARRAL ENERGY, L.L.C. (reported 2012-01)

!

EWA / Permit operator mismatch

Scheduling: SM ENERGY COMPANY ≠ Permit: CHAPARRAL ENERGY, L.L.C.

Resolved via: schedulingSM ENERGY COMPANY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2004-04

Last Production

2015-05

Operator History

originally filed by CHAPARRAL ENERGY, L.L.C. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#548021 A CHAPARRAL ENERGY, L.L.C.
received 2004-07-09

Well Details

Well Number
309
Max Depth
9,650 ft
Drill Type
Vertical
County
BORDEN
District
8
Completed
2004-08-21

Operator

Location
MIDLAND
P-5 Status
Y (filed 2025-07-04)
Cum Oil (all leases)
250,559,190 bbl
Cum Gas (all leases)
1,980,285,662 mcf
Activities
OPRS/G, OPRS/O
Total Permits
2,434

External Links

Live © 2026 Petrora