42-039-30345

HAYNES MARIE B. GDN.

BRAZORIA County · District 3 · BSE PRODUCTION CO. · CHENANGO WEST (8500 SD.)

RRC Lookup

Permits

2

Max Depth

8,809 ft

First Permit

2000-01-12

Latest Activity

2000-01-12

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1976-06-22

Shut-In

Plugged

2012-08-28

!

EWA / Production operator mismatch

Scheduling: BSE PRODUCTION CO. ≠ Production: WIMCO (reported 2004-04)

Resolved via: schedulingBSE PRODUCTION CO.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2012-08

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#490442 A BSE PRODUCTION CO.
received 2001-02-27
#490442 A ALEGRE ENERGY, INC.
received 1999-12-16

Well Details

Well Number
2
Max Depth
8,809 ft
Drill Type
Vertical
County
BRAZORIA
District
3
Completed
1976-06-22

Operator

Location
VICTORIA
P-5 Status
Y (filed 2021-12-10)
Cum Oil (all leases)
289,901 bbl
Cum Gas (all leases)
10,385,370 mcf
Total Permits
38

External Links

Live © 2026 Petrora