42-039-30722
UPERRY
BRAZORIA County · District 3 · BHP PETROLEUM COMPANY INC. · PEACH POINT SOUTH (11250)
Permits
1
Max Depth
11,906 ft
First Permit
1983-03-02
Latest Activity
1983-03-02
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1983-10-01
Shut-In
—
Plugged
1986-06-03
!
EWA / Permit operator mismatch
Scheduling: BHP PETROLEUM COMPANY INC. ≠ Permit: MONSANTO OIL COMPANY
Resolved via: scheduling → BHP PETROLEUM COMPANY INC.
Operator History
originally filed by MONSANTO OIL COMPANY — asset transferred
Permit History (1)
Permit Applications (1)
#187256 A MONSANTO OIL COMPANY
received 1983-03-02
Well Details
- Well Number
- 1B
- Max Depth
- 11,906 ft
- Drill Type
- Vertical
- County
- BRAZORIA
- District
- 3
- Operator
- BHP PETROLEUM COMPANY INC.
- Completed
- 1983-10-01
Operator
- Name
- BHP PETRO CO INC
- Location
- HOUSTON
- P-5 Status
- Y (filed 1992-01-03)
- Total Permits
- 28