42-039-32455
OBSERVATIONCLEMENS SALT DOME
BRAZORIA County · District 3 · CHEVRON PHILLIPS CHEMICAL CO LP · CLEMENS DOME
Permits
1
Max Depth
600 ft
First Permit
1992-05-04
Latest Activity
1992-05-04
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
1992-05-27
Shut-In
—
Plugged
—
P-5 Org Status: Active
!
EWA / Permit operator mismatch
Scheduling: CHEVRON PHILLIPS CHEMICAL CO LP ≠ Permit: PHILLIPS PETROLEUM COMPANY
Resolved via: scheduling → CHEVRON PHILLIPS CHEMICAL CO LP
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
originally filed by PHILLIPS PETROLEUM COMPANY — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#398482 A PHILLIPS PETROLEUM COMPANY
received 1992-04-16
Well Details
- Well Number
- 1GW
- Max Depth
- 600 ft
- Drill Type
- Vertical
- County
- BRAZORIA
- District
- 3
- Operator
- CHEVRON PHILLIPS CHEMICAL CO LP
- Completed
- 1992-05-27
Operator
- Location
- SWEENY
- P-5 Status
- Y (filed 2025-04-04)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- — mcf
- Activities
- OPRS/O
- Total Permits
- 3