42-039-32455

OBSERVATION

CLEMENS SALT DOME

BRAZORIA County · District 3 · CHEVRON PHILLIPS CHEMICAL CO LP · CLEMENS DOME

RRC Lookup

Permits

1

Max Depth

600 ft

First Permit

1992-05-04

Latest Activity

1992-05-04

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

1992-05-27

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: CHEVRON PHILLIPS CHEMICAL CO LP ≠ Permit: PHILLIPS PETROLEUM COMPANY

Resolved via: schedulingCHEVRON PHILLIPS CHEMICAL CO LP

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

originally filed by PHILLIPS PETROLEUM COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#398482 A PHILLIPS PETROLEUM COMPANY
received 1992-04-16

Well Details

Well Number
1GW
Max Depth
600 ft
Drill Type
Vertical
County
BRAZORIA
District
3
Completed
1992-05-27

Operator

Location
SWEENY
P-5 Status
Y (filed 2025-04-04)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
3

External Links

Live © 2026 Petrora