42-039-32742
Final Completion DirectionalLOCKE
BRAZORIA County · District 3 · SAMEDAN OIL CORPORATION · ALGOA WEST (FRIO MIDDLE)
Permits
3
Max Depth
9,500 ft
First Permit
2001-05-11
Latest Activity
2002-03-01
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2001-06-23
Shut-In
—
Plugged
2020-09-15
!
EWA / Production operator mismatch
Scheduling: SAMEDAN OIL CORPORATION ≠ Production: PINE RIDGE OPERATING, L.P. (reported 2020-02)
Resolved via: scheduling → SAMEDAN OIL CORPORATION
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2001-06
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (3)
Permit Applications (3)
#517983 A SAMEDAN OIL CORPORATION
received 2002-03-01
#508865 A ASPECT RESOURCES LLC
received 2001-07-18
#508865 A CONTINUOUS OPERATIONS, INC
received 2001-05-11
Well Details
- Well Number
- 1
- Max Depth
- 9,500 ft
- Drill Type
- Directional
- County
- BRAZORIA
- District
- 3
- Operator
- SAMEDAN OIL CORPORATION
- Completed
- 2001-06-23
Operator
- Name
- SAMEDAN OIL CORP
- Location
- HOUSTON
- P-5 Status
- Y (filed 2002-07-05)
- Cum Oil (all leases)
- 15,676,149 bbl
- Cum Gas (all leases)
- 103,040,153 mcf
- Total Permits
- 808