42-041-30502
Final CompletionPAYNE UNIT I
BRAZOS County · District 3 · LAREDO ENERGY IV L.P. · KURTEN (WOODBINE)
Permits
2
Max Depth
8,800 ft
First Permit
1980-03-11
Latest Activity
2006-06-28
Lifespan
26 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1990-01-02
Shut-In
—
Plugged
2023-10-07
!
EWA / Production operator mismatch
Scheduling: LAREDO ENERGY IV L.P. ≠ Production: HAWKWOOD ENERGY OPERATING, LLC (reported 2020-08)
!
EWA / Permit operator mismatch
Scheduling: LAREDO ENERGY IV L.P. ≠ Permit: LAREDO ENERGY
Resolved via: scheduling → LAREDO ENERGY IV L.P.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#621678 A LAREDO ENERGY
received 2006-06-27
#74807 A GULF CANADA ROYALITE LTD
received 1980-03-11
Well Details
- Well Number
- 1
- Max Depth
- 8,800 ft
- Drill Type
- Vertical
- County
- BRAZOS
- District
- 3
- Operator
- LAREDO ENERGY IV L.P.
- Completed
- 1990-01-02
Operator
- Name
- LAREDO ENGY IV, L.P
- Location
- HOUSTON
- P-5 Status
- Y (filed 2006-09-08)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- 34,002 mcf
- Total Permits
- 4