42-041-30558

Final Completion

HOLUBEC UNIT II

BRAZOS County · District 3 · OWS ENERGY INC. · KURTEN (WOODBINE)

RRC Lookup

Permits

1

Max Depth

9,250 ft

First Permit

1980-12-12

Latest Activity

1980-12-12

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-03-14

Shut-In

Plugged

1996-10-09

!

EWA / Permit operator mismatch

Scheduling: OWS ENERGY INC. ≠ Permit: GULF OIL CORP.

Resolved via: schedulingOWS ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

Chain of Custody

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#101951 A GULF OIL CORP.
received 1980-12-12

Well Details

Well Number
1
Max Depth
9,250 ft
Drill Type
Vertical
County
BRAZOS
District
3
Completed
1981-03-14

Operator

Location
MONTGOMERY
P-5 Status
Y (filed 2006-07-07)
Cum Oil (all leases)
23,018 bbl
Cum Gas (all leases)
8,065 mcf

External Links

Live © 2026 Petrora