42-041-30789

Final Completion

PATE O. L.

BRAZOS County · District 3 · PIERCE OPERATING COMPANY L.L.C. · KURTEN (WOODBINE)

RRC Lookup

Permits

2

Max Depth

8,843 ft

First Permit

1982-07-15

Latest Activity

1995-03-08

Lifespan

13 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-08-04

Shut-In

Plugged

2007-11-30

!

EWA / Permit operator mismatch

Scheduling: PIERCE OPERATING COMPANY L.L.C. ≠ Permit: PASTURE PRODUCTION COMPANY

Resolved via: schedulingPIERCE OPERATING COMPANY L.L.C.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2018-12

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (4)

#433167 A PASTURE PRODUCTION COMPANY
received 1995-02-22
#167038 A PASTURE PRODUCTION COMPANY
received 1984-10-04
#167038 A PASTURE PRODUCTION COMPANY
received 1984-05-18
#167038 A ENERGETICS, INC.
received 1982-07-15

Well Details

Well Number
1
Max Depth
8,843 ft
Drill Type
Vertical
County
BRAZOS
District
3
Completed
1984-08-04

Operator

Location
BRYAN
P-5 Status
Y (filed 2012-05-04)
Cum Oil (all leases)
62,726 bbl
Cum Gas (all leases)
263,828 mcf

External Links

Live © 2026 Petrora