42-041-30803

Final Completion DirectionalSidetrack

LEO L.

BRAZOS County · District 3 · TEXACO INC. · BRYAN (WOODBINE)

RRC Lookup

Permits

2

Max Depth

9,500 ft

First Permit

1982-08-31

Latest Activity

1988-01-04

Lifespan

5 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-03-21

Shut-In

Plugged

1998-09-10

!

EWA / Production operator mismatch

Scheduling: TEXACO INC. ≠ Production: B.W.O.C., INC. (reported 2002-06)

!

EWA / Permit operator mismatch

Scheduling: TEXACO INC. ≠ Permit: B.W.O.C., INC.

Resolved via: schedulingTEXACO INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

originally filed by B.W.O.C., INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#341015 A B.W.O.C., INC.
received 1988-01-04
#170488 A GETTY OIL CO.
received 1982-08-31

Well Details

Well Number
606
Max Depth
9,500 ft
Drill Type
Directional, Sidetrack
County
BRAZOS
District
3
Operator
TEXACO INC.
Completed
1983-03-21

Operator

Location
MIDLAND
P-5 Status
Y (filed 1992-08-03)
Total Permits
4,906

External Links

Live © 2026 Petrora