42-041-30841
Final CompletionBECKER-DUNCAN
BRAZOS County · District 3 · TEXACO INC. · BRYAN (WOODBINE)
Permits
1
Max Depth
8,950 ft
First Permit
1982-11-12
Latest Activity
1982-11-12
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1983-03-20
Shut-In
—
Plugged
1998-09-21
!
EWA / Production operator mismatch
Scheduling: TEXACO INC. ≠ Production: B.W.O.C., INC. (reported 2002-06)
!
EWA / Permit operator mismatch
Scheduling: TEXACO INC. ≠ Permit: GETTY OIL CO.
Resolved via: scheduling → TEXACO INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
originally filed by GETTY OIL CO. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#177187 A GETTY OIL CO.
received 1982-11-12
Well Details
- Well Number
- 1
- Max Depth
- 8,950 ft
- Drill Type
- Vertical
- County
- BRAZOS
- District
- 3
- Operator
- TEXACO INC.
- Completed
- 1983-03-20
Operator
- Name
- TEXACO INC
- Location
- MIDLAND
- P-5 Status
- Y (filed 1992-08-03)
- Total Permits
- 4,906