42-041-31190

HorizontalSidetrack

J. ANTHONY

BRAZOS County · District 3 · DYNAMIC PRODUCTION INC. · STONE CITY (AUSTIN CHALK)

RRC Lookup

Permits

5

Max Depth

8,250 ft

First Permit

1984-08-01

Latest Activity

1992-02-19

Lifespan

8 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1986-02-03

Shut-In

Plugged

2011-02-11

!

EWA / Production operator mismatch

Scheduling: DYNAMIC PRODUCTION INC. ≠ Production: APACHE CORPORATION (reported 2008-05)

Resolved via: schedulingDYNAMIC PRODUCTION INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2011-02

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (5)

#396792 A DYNAMIC PRODUCTION, INC.
received 1992-05-05
#396792 A DYNAMIC PRODUCTION, INC.
received 1992-02-21
#396792 A DYNAMIC PRODUCTION, INC.
received 1992-02-19
#301070 A PRODUCERS ENGINEERING COMPANY
received 1986-04-10
#247040 A PRODUCERS ENGINEERING COMPANY
received 1984-08-01

Well Details

Well Number
1H
Max Depth
8,250 ft
Drill Type
Horizontal, Sidetrack
County
BRAZOS
District
3
Completed
1986-02-03

Operator

Location
FORT WORTH
P-5 Status
Y (filed 2026-01-04)
Cum Oil (all leases)
1,405,763 bbl
Cum Gas (all leases)
70,410,297 mcf
Activities
G/PUR, OPRS/G, OPRS/O
Total Permits
276

External Links

Live © 2026 Petrora