42-041-31278

Final Completion

MCCONNELL

BRAZOS County · District 3 · POWERLINE ENERGY CORP. · AGGIELAND (WOODBINE)

RRC Lookup

Permits

1

Max Depth

10,250 ft

First Permit

1985-02-28

Latest Activity

1985-02-28

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-04-06

Shut-In

Plugged

1994-07-28

!

EWA / Permit operator mismatch

Scheduling: POWERLINE ENERGY CORP. ≠ Permit: GOLDSMITH, J. PAUL

Resolved via: schedulingPOWERLINE ENERGY CORP.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

originally filed by GOLDSMITH, J. PAUL — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#268225 A GOLDSMITH, J. PAUL
received 1985-02-28

Well Details

Well Number
1
Max Depth
10,250 ft
Drill Type
Vertical
County
BRAZOS
District
3
Completed
1985-04-06

Operator

Location
ARLINGTON
P-5 Status
Y (filed 2023-05-05)
Cum Oil (all leases)
11,478 bbl
Cum Gas (all leases)
93,679 mcf
Total Permits
6

External Links

Live © 2026 Petrora