42-041-31605

Final Completion HorizontalSidetrack

FOJTIK-SWOBODA

BRAZOS County · District 3 · HOLLEY OIL COMPANY LLC · GIDDINGS (BUDA)

RRC Lookup

Permits

7

Max Depth

11,000 ft

First Permit

1992-03-11

Latest Activity

1995-10-11

Lifespan

4 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1996-01-25

Shut-In

Plugged

2002-10-04

!

EWA / Permit operator mismatch

Scheduling: HOLLEY OIL COMPANY LLC ≠ Permit: BEXCO OPERATING, INC.

Resolved via: schedulingHOLLEY OIL COMPANY LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2008-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (7)

#440763 A BEXCO OPERATING, INC.
received 1995-10-11
#419195 A BEXCO OPERATING, INC.
received 1994-09-14
#419195 A BEXCO OPERATING, INC.
received 1994-07-22
#419195 A CHESAPEAKE OPERATING, INC.
received 1993-12-09
#406478 A CHESAPEAKE OPERATING, INC.
received 1992-11-23
#397403 A CHESAPEAKE OPERATING, INC.
received 1992-04-14
#397403 A CHESAPEAKE OPERATING, INC.
received 1992-03-11

Well Details

Well Number
1
Max Depth
11,000 ft
Drill Type
Horizontal, Sidetrack
County
BRAZOS
District
3
Completed
1996-01-25

Operator

Location
CHAPPELL HI, LL
P-5 Status
Y (filed 2025-12-04)
Cum Oil (all leases)
1,221,380 bbl
Cum Gas (all leases)
701,341 mcf
Activities
OPRS/G, OPRS/O
Total Permits
33

External Links

Live © 2026 Petrora