42-041-31881

Final Completion Horizontal

CHEYENNE

BRAZOS County · District 3 · BUFFCO PRODUCTION INC. · GIDDINGS (AUSTIN CHALK GAS)

RRC Lookup

Permits

2

Max Depth

11,600 ft

First Permit

1996-03-21

Latest Activity

1996-03-21

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1996-06-02

Shut-In

Plugged

2015-09-18

!

EWA / Production operator mismatch

Scheduling: BUFFCO PRODUCTION INC. ≠ Production: HEP OIL GP, LLC (reported 2008-07)

!

EWA / Permit operator mismatch

Scheduling: BUFFCO PRODUCTION INC. ≠ Permit: SHIELD PETROLEUM

Resolved via: schedulingBUFFCO PRODUCTION INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1996-06

Last Production

2015-09

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#446167 A SHIELD PETROLEUM
received 1996-10-22
#446167 A SHIELD PETROLEUM
received 1996-03-21

Well Details

Well Number
1H
Max Depth
11,600 ft
Drill Type
Horizontal
County
BRAZOS
District
3
Completed
1996-06-02

Operator

Location
LONGVIEW
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
10,625,782 bbl
Cum Gas (all leases)
62,183,923 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
385

External Links

Live © 2026 Petrora