42-049-31868
Final CompletionLEWALLEN
BROWN County · District 7 · SMITH PIPE OF ABILENE · BLIND HOG (RANGER)
Permits
2
Max Depth
3,500 ft
First Permit
1978-10-24
Latest Activity
1986-02-26
Lifespan
7 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1979-03-03
Shut-In
—
Plugged
2005-02-01
!
EWA / Production operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Production: MEHAFFEY INVESTMENTS, INC. (reported 2003-10)
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: GRIMM, JACK F.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2005-02
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#298570 A GRIMM, JACK F.
received 1986-02-26
#35377 A PALO PETROLEUM, INC.
received 1978-10-24
Well Details
- Well Number
- 1
- Max Depth
- 3,500 ft
- Drill Type
- Vertical
- County
- BROWN
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1979-03-03
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf