42-049-32056

Final Completion

STANBAUGH A

BROWN County · District 7 · PALO PETROLEUM INC. · PALO DAVIS (RANGER)

RRC Lookup

Permits

2

Max Depth

3,500 ft

First Permit

1979-06-06

Latest Activity

1980-08-22

Lifespan

1 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-03-14

Shut-In

Plugged

2014-06-23

!

EWA / Production operator mismatch

Scheduling: PALO PETROLEUM INC. ≠ Production: INTERSTATE EXPLORATIONS LLC (reported 2001-12)

Resolved via: schedulingPALO PETROLEUM INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#90677 A PALO PETROLEUM, INC.
received 1980-08-22
#50167 A PALO PETROLEUM, INC.
received 1979-06-06

Well Details

Well Number
1
Max Depth
3,500 ft
Drill Type
Vertical
County
BROWN
District
7
Completed
1980-03-14

Operator

Location
DALLAS
P-5 Status
Y (filed 2025-06-04)
Cum Oil (all leases)
480,126 bbl
Cum Gas (all leases)
3,667 mcf
Total Permits
304

External Links

Live © 2026 Petrora