42-049-32174
Final CompletionCARR VERNON
BROWN County · District 7 · SANTA ANNA PARTNERS LP · MICO(FRY)
Permits
1
Max Depth
850 ft
First Permit
1979-10-29
Latest Activity
1979-10-29
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1980-07-15
Shut-In
—
Plugged
2007-06-26
!
EWA / Permit operator mismatch
Scheduling: SANTA ANNA PARTNERS LP ≠ Permit: C B ENERGY CO.
Resolved via: scheduling → SANTA ANNA PARTNERS LP
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2007-06
Operator History
originally filed by C B ENERGY CO. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#62234 A C B ENERGY CO.
received 1979-10-29
Well Details
- Well Number
- 2
- Max Depth
- 850 ft
- Drill Type
- Vertical
- County
- BROWN
- District
- 7
- Operator
- SANTA ANNA PARTNERS LP
- Completed
- 1980-07-15
Operator
- Name
- SANTA ANNA PTRS, LP
- Location
- CALABASAS
- P-5 Status
- Y (filed 2026-02-04)
- Cum Oil (all leases)
- 1,509 bbl
- Cum Gas (all leases)
- 2,344 mcf
- Activities
- OPRS/G
- Total Permits
- 11