42-051-33408

Final Completion Horizontal

QUEBE UNIT

BURLESON County · District 3 · CHESAPEAKE OPERATING INC. · GIDDINGS (AUSTIN CHALK GAS)

RRC Lookup

Permits

1

Max Depth

11,500 ft

First Permit

1993-10-26

Latest Activity

1993-10-26

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1994-01-14

Shut-In

Plugged

2010-08-24

!

EWA / Production operator mismatch

Scheduling: CHESAPEAKE OPERATING INC. ≠ Production: WILLIAMS, CLAYTON ENERGY, INC. (reported 1995-08)

!

EWA / Permit operator mismatch

Scheduling: CHESAPEAKE OPERATING INC. ≠ Permit: WILLIAMS, CLAYTON ENERGY, INC.

Resolved via: schedulingCHESAPEAKE OPERATING INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1994-01

Last Production

2010-08

Operator History

originally filed by WILLIAMS, CLAYTON ENERGY, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#417478 A WILLIAMS, CLAYTON ENERGY, INC.
received 1993-10-25

Well Details

Well Number
1
Max Depth
11,500 ft
Drill Type
Horizontal
County
BURLESON
District
3
Completed
1994-01-14

Operator

Location
OKLAHOMA CI, TY
P-5 Status
Y (filed 2025-07-04)
Cum Oil (all leases)
120,218,990 bbl
Cum Gas (all leases)
5,501,647,035 mcf
Total Permits
13,061

External Links

Live © 2026 Petrora