42-059-33358

Final Completion

NEUMAN 2041-A

CALLAHAN County · District 7 · MOMENTUM OPERATING CO. INC. · PUTNAM NORTH (CROSS CUT)

RRC Lookup

Permits

1

Max Depth

2,200 ft

First Permit

1981-10-09

Latest Activity

1981-10-09

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-03-30

Shut-In

Plugged

2005-04-19

!

EWA / Production operator mismatch

Scheduling: MOMENTUM OPERATING CO. INC. ≠ Production: ORTH OIL COMPANY, INC. (reported 1993-08)

!

EWA / Permit operator mismatch

Scheduling: MOMENTUM OPERATING CO. INC. ≠ Permit: LA ACEITE ENERGY, INC.

Resolved via: schedulingMOMENTUM OPERATING CO. INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2025-04

Operator History

originally filed by LA ACEITE ENERGY, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#136155 A LA ACEITE ENERGY, INC.
received 1981-10-09

Well Details

Well Number
3
Max Depth
2,200 ft
Drill Type
Vertical
County
CALLAHAN
District
7
Completed
1985-03-30

Operator

Location
ALBANY
P-5 Status
Y (filed 2025-06-04)
Cum Oil (all leases)
4,043,605 bbl
Cum Gas (all leases)
13,883,043 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
148

External Links

Live © 2026 Petrora