42-059-34813

Final Completion

PARROTT JOHNNY R.

CALLAHAN County · District 7 · SMITH PIPE OF ABILENE · STONE (CROSS PLAINS)

RRC Lookup

Permits

2

Max Depth

4,500 ft

First Permit

1984-02-09

Latest Activity

1986-07-01

Lifespan

2 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1986-08-08

Shut-In

Plugged

1996-01-18

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: L.C.S. PRODUCTION COMPANY (reported 1993-09)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: SPENCER PETROLEUM CO.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2003-08

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#303738 A SPENCER PETROLEUM CO.
received 1986-06-27
#228821 A SPENCER PETROLEUM CO.
received 1984-03-14
#228821 A SPENCER PETROLEUM CO.
received 1984-02-03

Well Details

Well Number
1
Max Depth
4,500 ft
Drill Type
Vertical
County
CALLAHAN
District
7
Completed
1986-08-08

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora