42-059-34879

Final Completion

PARROTT JOHNNY R.

CALLAHAN County · District 7 · SMITH PIPE OF ABILENE · PARROTT S. (ELLENBURGER)

RRC Lookup

Permits

1

Max Depth

4,500 ft

First Permit

1984-04-10

Latest Activity

1984-04-10

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1987-11-07

Shut-In

Plugged

1996-01-04

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: SPENCER PETROLEUM CO.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2003-08

Operator History

originally filed by SPENCER PETROLEUM CO. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#235077 A SPENCER PETROLEUM CO.
received 1984-04-10

Well Details

Well Number
2
Max Depth
4,500 ft
Drill Type
Vertical
County
CALLAHAN
District
7
Completed
1987-11-07

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora