42-059-35280
Final CompletionBETCHER A.
CALLAHAN County · District 7 · SMITH PIPE OF ABILENE · PECAN BAYOU (ELLEN.)
Permits
1
Max Depth
4,999 ft
First Permit
1985-03-08
Latest Activity
1985-03-08
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-04-15
Shut-In
—
Plugged
1990-03-23
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: HOFCO, INC.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Operator History
originally filed by HOFCO, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#268980 A HOFCO, INC.
received 1985-03-07
Well Details
- Well Number
- 1
- Max Depth
- 4,999 ft
- Drill Type
- Vertical
- County
- CALLAHAN
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1985-04-15
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf