42-059-35335

Final Completion

BETCHER

CALLAHAN County · District 7 · SMITH PIPE OF ABILENE · PECAN BAYOU (ELLEN.)

RRC Lookup

Permits

1

Max Depth

5,000 ft

First Permit

1985-05-14

Latest Activity

1985-05-14

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-07-25

Shut-In

Plugged

1992-05-20

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: STRATTON, TOMMY

Resolved via: schedulingSMITH PIPE OF ABILENE

Operator History

originally filed by STRATTON, TOMMY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#274909 A STRATTON, TOMMY
received 1985-05-08

Well Details

Well Number
2
Max Depth
5,000 ft
Drill Type
Vertical
County
CALLAHAN
District
7
Completed
1985-07-25

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora