42-059-35635

Final Completion

BETCHER A.

CALLAHAN County · District 7 · SMITH PIPE OF ABILENE · PECAN BAYOU (ELLEN.)

RRC Lookup

Permits

1

Max Depth

4,800 ft

First Permit

1986-08-08

Latest Activity

1986-08-08

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1986-10-01

Shut-In

Plugged

1990-03-21

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: HOFCO, INC.

Resolved via: schedulingSMITH PIPE OF ABILENE

Operator History

originally filed by HOFCO, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#305058 A HOFCO, INC.
received 1986-08-07

Well Details

Well Number
3
Max Depth
4,800 ft
Drill Type
Vertical
County
CALLAHAN
District
7
Completed
1986-10-01

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf