42-059-36275

Final Completion

PARSONS I. M. L

CALLAHAN County · District 7 · SUN-KEY OIL CO. INC. · PARSONS (GRAY)

RRC Lookup

Permits

1

Max Depth

3,500 ft

First Permit

1993-03-17

Latest Activity

1993-03-17

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1993-04-19

Shut-In

Plugged

1997-11-20

!

EWA / Permit operator mismatch

Scheduling: SUN-KEY OIL CO. INC. ≠ Permit: PUTNAM OIL PRODUCTION

Resolved via: schedulingSUN-KEY OIL CO. INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-04

Last Production

1998-02

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#409770 A PUTNAM OIL PRODUCTION
received 1993-03-11

Well Details

Well Number
14
Max Depth
3,500 ft
Drill Type
Vertical
County
CALLAHAN
District
7
Completed
1993-04-19

Operator

Location
DUBLIN
P-5 Status
Y (filed 2026-01-05)
Cum Oil (all leases)
88,064 bbl
Cum Gas (all leases)
3,125,284 mcf
Activities
OPRS/G
Total Permits
10

External Links

Live © 2026 Petrora