42-059-36601

Final Completion

HARVILLE

CALLAHAN County · District 7 · ENCON SERVICES INC. · GRAND OLD OPLIN (GRAY)

RRC Lookup

Permits

1

Max Depth

4,000 ft

First Permit

2002-03-28

Latest Activity

2002-03-28

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2002-06-15

Shut-In

Plugged

2011-03-08

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2002-06

Last Production

2011-08

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#518614 A ENCON SERVICES, INC.
received 2002-03-27

Well Details

Well Number
3
Max Depth
4,000 ft
Drill Type
Vertical
County
CALLAHAN
District
7
Completed
2002-06-15

Operator

Location
ABILENE
P-5 Status
Y (filed 2011-12-09)
Cum Oil (all leases)
579,959 bbl
Cum Gas (all leases)
1,930,190 mcf
Total Permits
93

External Links

Live © 2026 Petrora