42-065-30794
Final CompletionCULVER C. L.
CARSON County · District 10 · CAPROCK ENGINEERING INC. · PANHANDLE WEST
Permits
1
Max Depth
3,200 ft
First Permit
1980-05-01
Latest Activity
1980-05-01
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1980-08-15
Shut-In
—
Plugged
2017-01-09
!
EWA / Permit operator mismatch
Scheduling: CAPROCK ENGINEERING INC. ≠ Permit: FARRELL, ROY JR.
Resolved via: scheduling → CAPROCK ENGINEERING INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2017-01
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#79991 A FARRELL, ROY JR.
received 1980-05-01
Well Details
- Well Number
- 1A
- Max Depth
- 3,200 ft
- Drill Type
- Vertical
- County
- CARSON
- District
- 10
- Operator
- CAPROCK ENGINEERING INC.
- Completed
- 1980-08-15
Operator
- Location
- PAMPA
- P-5 Status
- Y (filed 2018-06-08)
- Cum Oil (all leases)
- 82,305 bbl
- Cum Gas (all leases)
- 5,444,852 mcf
- Total Permits
- 48