42-071-31653

Final Completion

STATE TRACT 94

CHAMBERS County · District 3 · ECC ENERGY CORPORATION · CEDAR POINT (MIOCENE -A-)

RRC Lookup

Permits

1

Max Depth

7,800 ft

First Permit

1984-12-04

Latest Activity

1984-12-04

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-04-25

Shut-In

Plugged

2001-11-11

!

EWA / Permit operator mismatch

Scheduling: ECC ENERGY CORPORATION ≠ Permit: EQUITX ENERGY CORP.

Resolved via: schedulingECC ENERGY CORPORATION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2001-11

Operator History

originally filed by EQUITX ENERGY CORP. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#259569 A EQUITX ENERGY CORP.
received 1985-03-07
#259569 A EQUITY DRILLING COMPANY, INC.
received 1984-11-12

Well Details

Well Number
2
Max Depth
7,800 ft
Drill Type
Vertical
County
CHAMBERS
District
3
Completed
1985-04-25

Operator

Location
DEWEY
P-5 Status
Y (filed 2003-07-11)
Cum Oil (all leases)
34,622 bbl
Cum Gas (all leases)
1,117 mcf

External Links

Live © 2026 Petrora