42-071-31674
INJECTIONSORELLE
CHAMBERS County · District 3 · SHOCO PRODUCTION LLC · WINNIE N.(4800)
Permits
2
Max Depth
7,806 ft
First Permit
1985-02-05
Latest Activity
2013-02-27
Lifespan
28 yrs
Regulatory Status
Schedule
ON SCHEDULE
Completion
2023-06-16
Shut-In
—
Plugged
—
P-5 Org Status: X
!
EWA / Permit operator mismatch
Scheduling: SHOCO PRODUCTION LLC ≠ Permit: GOLDSTON OIL CORPORATION
Resolved via: scheduling → SHOCO PRODUCTION LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
originally filed by GOLDSTON OIL CORPORATION — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#757399 A GOLDSTON OIL CORPORATION
received 2013-02-22
#266044 A PHILLIPS PETROLEUM COMPANY
received 1985-01-25
Well Details
- Well Number
- 2
- Max Depth
- 7,806 ft
- Drill Type
- Vertical
- County
- CHAMBERS
- District
- 3
- Operator
- SHOCO PRODUCTION LLC
- Completed
- 2023-06-16
Operator
- Name
- SHOCO PROD LLC
- Location
- KILGORE
- P-5 Status
- Y (filed 2025-11-04)
- Cum Oil (all leases)
- 393,112 bbl
- Cum Gas (all leases)
- 2,093,473 mcf
- Activities
- OPRS/G, OPRS/O
- Total Permits
- 2