42-073-30415
Final CompletionTRAVIS -B-
CHEROKEE County · District 6 · DALLAS PRODUCTION INC. · PERCY WHEELER (TRAVIS PEAK)
Permits
1
Max Depth
10,000 ft
First Permit
1981-02-12
Latest Activity
1981-02-12
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1981-08-25
Shut-In
—
Plugged
1994-09-08
!
EWA / Permit operator mismatch
Scheduling: DALLAS PRODUCTION INC. ≠ Permit: PITTS OIL CO.-DALLAS PROD. INC.
Resolved via: scheduling → DALLAS PRODUCTION INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1994-09
Operator History
originally filed by PITTS OIL CO.-DALLAS PROD. INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#108302 A PITTS OIL CO.-DALLAS PROD. INC.
received 1981-02-12
Well Details
- Well Number
- 3
- Max Depth
- 10,000 ft
- Drill Type
- Vertical
- County
- CHEROKEE
- District
- 6
- Operator
- DALLAS PRODUCTION INC.
- Completed
- 1981-08-25
Operator
- Name
- DALLAS PROD, INC
- Location
- DALLAS
- P-5 Status
- Y (filed 2020-12-04)
- Cum Oil (all leases)
- 3,138,597 bbl
- Cum Gas (all leases)
- 150,942,979 mcf
- Total Permits
- 823