42-073-30415

Final Completion

TRAVIS -B-

CHEROKEE County · District 6 · DALLAS PRODUCTION INC. · PERCY WHEELER (TRAVIS PEAK)

RRC Lookup

Permits

1

Max Depth

10,000 ft

First Permit

1981-02-12

Latest Activity

1981-02-12

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-08-25

Shut-In

Plugged

1994-09-08

!

EWA / Permit operator mismatch

Scheduling: DALLAS PRODUCTION INC. ≠ Permit: PITTS OIL CO.-DALLAS PROD. INC.

Resolved via: schedulingDALLAS PRODUCTION INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1994-09

Operator History

originally filed by PITTS OIL CO.-DALLAS PROD. INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#108302 A PITTS OIL CO.-DALLAS PROD. INC.
received 1981-02-12

Well Details

Well Number
3
Max Depth
10,000 ft
Drill Type
Vertical
County
CHEROKEE
District
6
Completed
1981-08-25

Operator

Location
DALLAS
P-5 Status
Y (filed 2020-12-04)
Cum Oil (all leases)
3,138,597 bbl
Cum Gas (all leases)
150,942,979 mcf
Total Permits
823

External Links

Live © 2026 Petrora